Confirm the drawing
Agree product type, length, height, tube specification, rail arrangement, gate hardware, finish and packing.
Our 2,000 m² factory in Anping, Hebei brings tube fabrication, welding, surface preparation and panel packing together. Clear drawings and repeatable specifications guide each order.

Standard production planning is based on about 300 panels per day. Actual scheduling is confirmed around the design, finish and order mix.
Agree product type, length, height, tube specification, rail arrangement, gate hardware, finish and packing.
Cutting, punching and bending prepare the steel tube for the specified panel and gate geometry.
CO₂ shielded and laser welding are used for full weld construction, with missed welds and surface defects checked.
Grinding, sanding and shot blasting prepare the welded panel for the agreed finish.
Electrostatic powder coating follows surface preparation. The coating thickness reference is 120–160 μm.
Dimensions, finish and assembly connections are checked before wrapping, iron pallet packing and loading.
A close look at the tube processing operation in the workshop.
Tube processing and handling in a short workshop clip.
Finished red powder coated panels, gate frames and connection details.
A closer view of the finished panel structure.
Share your panel requirements, reference photos and order quantity. We’ll help you define the production and packing details.